Free Siding Estimate Template

A complete, line-item siding estimate you can preview below — tear-off and disposal, water-resistive barrier, flashing and trim, fiber-cement lap siding, caulk and paint, plus labor — with a plain-language guide to the drainage plane, flashing details and fastening the IRC requires.

Estimate #SD-2026-142
Petrov Residence — Full Siding Replacement
2,150 sq ft wall area · fiber-cement lap · wrapped trim
Sample
Line itemQtyAmount
Tear-off existing siding & disposal2,150 sf$2,365.00
Sheathing repair allowance8 sheets$560.00
Water-resistive barrier & seam tape2,150 sf$860.00
Flashing — window, door, kick-out1 lot$740.00
Fiber-cement lap siding (incl. waste)2,365 sf$4,730.00
Corner boards, trim & soffit detail480 lf$1,920.00
Caulk, fasteners & touch-up paint1 lot$690.00
Installation labor2,150 sf$6,450.00
Total$18,315.00

Payment schedule

Deposit (on approval) (30%)$5,494.50
Tear-off, wrap & flashing complete (35%)$6,410.25
Final — siding, trim & caulk (35%)$6,410.25

How to measure and price siding work

  • Measure wall area by elevation (width x height) and subtract only large openings; gables are 1/2 base x height.
  • Add 10% waste on lap siding and 15% on shake or board-and-batten patterns.
  • Always carry a sheathing-repair allowance per sheet — you never know what's behind the old siding.

Siding building-code guide

2021 IRC R703 — exterior covering, water-resistive barrier and flashing

Siding is a rain screen, not a seal. Inspectors look at the water-resistive barrier behind it, the flashing at every opening and penetration, and the fastening schedule.

WATER-RESISTIVE BARRIER (IRC R703.2)
  • A WRB equivalent to one layer of No. 15 asphalt felt is required over all exterior sheathing
  • Install shingle-style from the bottom up, with horizontal laps of at least 2" and vertical laps of 6"
  • Fiber-cement and most manufactured claddings require a drainage gap or drainable WRB in wet climates — check the instructions
FLASHING (IRC R703.4)
  • Flashing required at: tops of windows and doors, at wall/roof intersections, at decks and balconies, and at every penetration
  • Kick-out flashing where a roof edge meets a wall is mandatory — its absence is the most common cause of hidden wall rot
  • Integrate flashing with the WRB in the correct order (sill pan first, then jambs, then head flashing over the WRB fold)
CLEARANCES & FASTENING (R703.3 / R703.10)
  • Maintain 6" clearance to grade and 2" to hard surfaces such as walks, decks and roofs
  • Fasten into studs at the manufacturer's spacing; blind-nail lap siding at the correct overlap (typically 1-1/4in)
  • Corrosion-resistant fasteners only — electro-galvanized nails will bleed through the finish
JOINTS & SEALANT
  • Butt joints in fiber-cement need joint flashing behind them; caulking a butt joint alone is not an approved detail
  • Do not caulk the bottom lap of siding or the weep path at trim — the wall has to drain
  • Leave the manufacturer's gap at trim and openings and seal with a flexible, paintable sealant rated for the substrate

Code quick referenceSiding

ItemRequirementCode reference
Water-resistive barrierContinuous, lapped shingle-style over sheathingIRC R703.2
FlashingAt openings, horizontal joints, and wall/roof intersectionsIRC R703.4
Clearance to gradeFollow manufacturer, typically 6in to soil, 1-2in to hardscapeManufacturer
FastenersCorrosion-resistant, penetrate framing per tableIRC Table R703.3(1)
Weep screed / kickoutKickout flashing where roof meets wallIRC R903.2.1

Drawings & details

Simplified section and plan views of the details inspectors look at most. Illustrative only — not to scale.

Wall drainage assembly
1 · Siding — 0.50"clearance to grade / roof0.50"2 · Rainscreen or furring — 0.50"optional but recommended0.50"3 · WRB / housewrap — 0.06"laps over flashing4 · Sheathing + framing — 0.50"0.50"1 9/16"Section view — top layer first · Total assembly: 1.56"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Sidingclearance to grade / roof(0.50")
  • 2 · Rainscreen or furringoptional but recommended(0.50")
  • 3 · WRB / housewraplaps over flashing(0.06")
  • 4 · Sheathing + framingLayer in the assembly, drawn top to bottom(0.50")
Client presentation summary
  • Siding: 0.50"
  • Rainscreen or furring: 0.50"
  • WRB / housewrap: 0.06"
  • Sheathing + framing: 0.50"
  • Total assembly: 1.56" (1 9/16")
Water-resistive barrier lapped shingle-style; flashing at every horizontal interruption.
Fastening & laps
2 · 16.00" OC1 · 1.50"3 · 8' 0"4 · 8' 1 8/16"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Member thicknessNail into studs · min lap per manufacturer(1.50")
  • 2 · On-center spacing16in OC studs(16.00" OC)
  • 3 · Member lengthPlate to plate(8' 0")
  • 4 · Overall runTotal covered by this layout(8' 1 8/16")
Client presentation summary
  • On-center spacing: 16.00" · 7 members
  • Overall run: 8' 1 8/16" · Member length: 8' 0"
  • Nail into studs · min lap per manufacturer
Inspection-day checklistShow
  • WRB laps and taped seams photographed before siding covers them.
  • Kickout flashing at every roof-to-wall termination.
  • Fasteners hitting studs, not just sheathing.
  • Expansion gaps at trim and butt joints per manufacturer.
  • Penetrations (lights, hose bibbs, vents) flashed and sealed.

Code references are based on the 2021 IRC and related model codes. Local amendments, state codes and manufacturer instructions can be stricter — always confirm with your local building department before starting work.

Common siding estimating mistakes

  • No allowance for rotten sheathing or missing flashing, which turns into an awkward mid-job change order.
  • Forgetting trim wrap, corners and soffit details — usually 15–20% of the material cost.
  • Quoting scaffolding and two-story access as if it were single-story labor.
PDF & client share

Export a branded, client-ready PDF or send a sign-from-phone link.

Digital signature

Your client reviews and signs the estimate from any device.

Code-aware

IRC R703 guidance for the water-resistive barrier, kick-out and window flashing, clearances and fastening.

Siding estimate FAQ

What should a siding estimate include?

A siding estimate should list tear-off and disposal, a sheathing repair allowance, the water-resistive barrier, flashing, siding material with waste, corners and trim, caulk and fasteners, and installation labor.

How do you measure siding square footage?

Measure each elevation's width times height, treat gables as half the base times the height, and subtract only large openings such as garage doors and picture windows. Add 10–15% for waste.

What code governs siding installation?

IRC R703 covers exterior wall coverings: R703.2 requires a water-resistive barrier, R703.4 requires flashing at openings and roof-wall intersections, and R703.3 sets clearances to grade and fastening requirements.