Free Pergola Estimate Template

A complete, line-item pergola estimate you can preview below — concrete footings, 6x6 posts, double beams, rafters and purlins, structural hardware, stain and labor — plus a plain-language code checklist for footing depth, post bases and lateral bracing.

Estimate #PG-2026-031
Whitaker Residence — 12x16 Freestanding Pergola
6 posts · double 2x10 beams · 2x8 rafters at 16in o.c. · cedar-tone stain
Sample
Line itemQtyAmount
Concrete footings (6 @ 12in dia x 42in)6 ea$720.00
6x6 posts + standoff post bases6 ea$690.00
Double 2x10 beams64 lf$540.00
2x8 rafters & 2x2 purlins1 lot$860.00
Structural hardware & fasteners1 lot$310.00
Stain / sealer (2 coats)1 lot$240.00
Labor — carpentry crew28 hrs$2,240.00
Total$5,600.00

Payment schedule

Deposit (on approval) (30%)$1,680.00
Footings poured & posts set (40%)$2,240.00
Final — rafters, stain & cleanup (30%)$1,680.00

How to measure and price pergola work

  • Price footings per pier (dig + concrete + base), not as a lump sum — pier count drives most of the excavation labor.
  • Take beams and rafters off in linear feet by member size, then add 10% waste for cuts and end details.
  • Quote stain as a separate line with the number of coats; owners routinely ask to remove or upgrade it.

Pergola building-code guide

2021 IRC R403 (footings), R507.2 (wood durability) and R301 (wind/snow loads)

Pergolas look simple, but inspectors focus on three things: how deep the footings go, how the posts are anchored, and whether the structure can resist wind uplift and lateral movement.

FOOTINGS (IRC R403.1.4)
  • Footings must bear on undisturbed soil, minimum 12in below finished grade and below the local frost line
  • Typical residential pergola: 12in diameter x 36–48in deep piers, sized up for large beam spans or heavy snow
  • Slope or crown the top of the pier so water drains away from the post base
POST ANCHORING & DURABILITY (R317 / R507.2)
  • Use galvanized or stainless standoff post bases — posts should never sit directly on concrete or soil
  • Wood in contact with concrete must be pressure-treated, naturally durable (cedar/redwood) or separated by an approved barrier
  • Fasteners and connectors in contact with treated lumber must be hot-dip galvanized or stainless (ACQ corrodes plain steel)
STRUCTURE & LOADS (R301.2)
  • Design for the local wind speed and, in snow country, for snow accumulating on closely spaced purlins
  • Add knee braces or a moment connection at each post — open frames have no shear wall to resist racking
  • An attached pergola must be ledger-bolted into the rim joist with flashing, exactly like a deck ledger (R507.9)

Drawings & details

Simplified section and plan views of the details inspectors look at most. Illustrative only — not to scale.

Post footing (IRC R403)
Grade1 · 36.00"2 · 12.00"3 · 3' 0"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Depth below grade36-48in / below frost line(36.00")
  • 2 · Footing width12in dia pier(12.00")
  • 3 · Height above grade6x6 post on standoff base(3' 0")
Client presentation summary
  • Depth below grade: 36.00" · Footing width: 12.00"
  • Height above grade: 3' 0"
  • 36-48in / below frost line
Standoff base keeps end grain off concrete; crown the pier so water drains away.
Rafter & purlin layout
2 · 16.00" OC1 · 1.50"3 · 8' 0"4 · 8' 1 8/16"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Member thickness2x8 rafters over double 2x10 beams(1.50")
  • 2 · On-center spacing16-24in OC(16.00" OC)
  • 3 · Member lengthPlate to plate(8' 0")
  • 4 · Overall runTotal covered by this layout(8' 1 8/16")
Client presentation summary
  • On-center spacing: 16.00" · 7 members
  • Overall run: 8' 1 8/16" · Member length: 8' 0"
  • 2x8 rafters over double 2x10 beams
Closer purlin spacing gives more shade but collects more snow load.

Code references are based on the 2021 IRC and related model codes. Local amendments, state codes and manufacturer instructions can be stricter — always confirm with your local building department before starting work.

Common pergola estimating mistakes

  • Under-sizing the beam for a wide post spacing — a 16 ft span needs a real beam, not a doubled 2x8.
  • Forgetting hardware cost: post bases, hurricane ties and structural screws add up fast on a 6-post frame.
  • Leaving out permit and inspection time on attached pergolas, which are treated like deck ledger work.
PDF & client share

Export a branded, client-ready PDF or send a sign-from-phone link.

Digital signature

Your client reviews and signs the estimate from any device.

Code-aware

IRC guidance for footing depth, standoff post bases, treated-lumber fasteners and lateral bracing.

Pergola estimate FAQ

What should a pergola estimate include?

A pergola estimate should list footings by pier, posts and post bases, beams, rafters and purlins, structural hardware, stain or sealer, labor hours, and the permit when required, plus a milestone payment schedule.

How much does it cost to build a pergola?

Most residential pergolas price out between $4,000 and $9,000 installed, depending on size, species (pressure-treated vs. cedar), whether it is attached or freestanding, and local labor rates.

Do pergolas need a permit?

Many jurisdictions require a permit for a pergola over a certain footprint or when it is attached to the house. Attached pergolas are usually reviewed like deck ledgers, so check your local amendments before quoting.