A complete, line-item electrical estimate you can preview below — service panel upgrade, branch circuits, devices, GFCI/AFCI protection, fixtures, licensed labor and permit — plus a plain-language NEC checklist covering the receptacle spacing, protection and box-fill rules inspectors actually check.

Estimate #ET-2026-031
Whitfield Residence — Panel Upgrade & Remodel Wiring
200A service · 14 circuits · 38 devices · permit included
Sample
Line itemQtyAmount
200A service panel upgrade (panel, breakers, mast)1$1,850.00
Branch circuit wiring — 12/2 & 14/2 NM-B14 runs$1,120.00
Receptacles, switches & plates38 devices$684.00
GFCI / AFCI breakers6$390.00
Recessed LED fixtures & trim12$540.00
Labor — licensed electrician + helper36 hrs$3,060.00
Permit & inspection1$295.00
Total$7,939.00

Payment schedule

Deposit (on approval) (30%)$2,381.70
Rough-in inspection passed (40%)$3,175.60
Final — trim out & final inspection (30%)$2,381.70

How to measure and price electrical work

  • Count devices (receptacles, switches, fixtures) and circuits — most residential electrical is priced per device plus per home run.
  • Price the service or panel work as its own package, including breakers, mast, meter can and grounding.
  • Add licensed electrician hours separately from helper hours; inspectors and permits always get their own line.

Electrical building-code guide

NFPA 70 (NEC) Articles 210, 250, 300, 314, 406 + IRC Chapters 34–43

Electrical rough-in inspections come down to circuit protection, receptacle spacing, box fill, grounding and support. These are the rules that most often fail an inspection.

RECEPTACLE SPACING & CIRCUITS (NEC 210.52 / 210.11)
  • No point along a wall may be more than 6 ft from a receptacle (12 ft maximum spacing); any wall section 2 ft or wider needs one
  • Kitchen counters: receptacles max 4 ft apart, plus at least two 20A small-appliance circuits
  • Dedicated circuits required for laundry (20A), bathroom (20A), dishwasher, disposal and microwave
GFCI & AFCI PROTECTION (NEC 210.8 / 210.12)
  • GFCI required in bathrooms, kitchens, garages, basements, laundry, outdoors and within 6 ft of any sink
  • AFCI required for most 120V 15A/20A circuits in habitable rooms — bedrooms, living rooms, hallways, kitchens and laundry
  • Dual-function AFCI/GFCI breakers are the usual solution for kitchen and laundry circuits
BOXES, FILL & SUPPORT (NEC 314 / 334.30)
  • Box fill must be calculated — count conductors, devices, clamps and grounds; overfilled boxes are a common red tag
  • NM cable must be secured within 12in of a box (8in for single-gang plastic) and every 4.5 ft after
  • Cables through studs must be 1-1/4in back from the face or protected with a steel nail plate
PANEL, GROUNDING & BONDING (NEC 250 / 408)
  • Grounding electrode system: two ground rods (or rod + Ufer/concrete-encased electrode) with #6 copper minimum
  • Neutrals and grounds are separated in every sub-panel; bonded only at the service disconnect
  • Panel working space: 30in wide, 36in deep, 6.5 ft high clearance and it must never be in a clothes closet or bathroom

Code quick referenceElectrical

ItemRequirementCode reference
Receptacle spacingNo point along a wall more than 6 ft from a receptacleNEC 210.52(A)
Kitchen countersTwo 20A circuits; receptacle within 24in of any pointNEC 210.52(C)
GFCIKitchens, baths, garages, outdoors, laundry, within 6 ft of sinksNEC 210.8
AFCIMost 120V branch circuits in dwelling living areasNEC 210.12
Conductor size14 AWG = 15A, 12 AWG = 20A, 10 AWG = 30A (copper)NEC 240.4(D)
Cable protection1-1/4in from framing edge or steel nail plateNEC 300.4
Box fillVolume computed from conductor and device countNEC 314.16

Drawings & details

Simplified section and plan views of the details inspectors look at most. Illustrative only — not to scale.

Receptacle spacing (NEC 210.52)
2 · 12.00" OC1 · 1.50"3 · 8' 0"4 · 6' 1 8/16"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Member thicknessNo point along wall > 6 ft from a receptacle(1.50")
  • 2 · On-center spacing12 ft max(12.00" OC)
  • 3 · Member lengthPlate to plate(8' 0")
  • 4 · Overall runTotal covered by this layout(6' 1 8/16")
Client presentation summary
  • On-center spacing: 12.00" · 7 members
  • Overall run: 6' 1 8/16" · Member length: 8' 0"
  • No point along wall > 6 ft from a receptacle
Any wall segment 2 ft or wider counts. Kitchen counters: receptacle within 24in of each point.
Circuit build-up
1 · Breaker (AFCI/GFCI as required) — 0.50"15A = 14 AWG · 20A = 12 AWG0.50"2 · Cable through framing — 0.25"1-1/4in from edge or nail plate0.25"3 · Box fill & ground — 0.50"count conductors per 314.160.50"4 · Device + cover — 0.50"tamper-resistant in dwellings0.50"1 12/16"Section view — top layer first · Total assembly: 1.75"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Breaker (AFCI/GFCI as required)15A = 14 AWG · 20A = 12 AWG(0.50")
  • 2 · Cable through framing1-1/4in from edge or nail plate(0.25")
  • 3 · Box fill & groundcount conductors per 314.16(0.50")
  • 4 · Device + covertamper-resistant in dwellings(0.50")
Client presentation summary
  • Breaker (AFCI/GFCI as required): 0.50"
  • Cable through framing: 0.25"
  • Box fill & ground: 0.50"
  • Device + cover: 0.50"
  • Total assembly: 1.75" (1 12/16")
AFCI protection for most living-area circuits; GFCI for kitchens, baths, garages, outdoors, laundry.
Inspection-day checklistShow
  • Rough-in: boxes set to drywall depth, cables stapled within 8in of boxes.
  • Grounds and neutrals separated in sub-panels.
  • Panel schedule filled out legibly with circuit descriptions.
  • Tamper-resistant receptacles in dwelling areas; weather-resistant + covers outdoors.
  • Arc-fault/GFCI devices tested and torque values set per label.

Code references are based on the 2021 IRC and related model codes. Local amendments, state codes and manufacturer instructions can be stricter — always confirm with your local building department before starting work.

Common electrical estimating mistakes

  • Not counting AFCI/GFCI breakers, which cost several times a standard breaker.
  • Forgetting drywall patching and paint after old-work wiring.
  • Skipping the temporary power or utility disconnect coordination on service upgrades.
PDF & client share

Export a branded, client-ready PDF or send a sign-from-phone link.

Digital signature

Your client reviews and signs the estimate from any device.

Code-aware

NEC guidance for receptacle spacing, GFCI/AFCI protection, box fill, grounding and panel clearances.

Electrical estimate FAQ

What should an electrical estimate include?

An electrical estimate should list the service or panel work, each branch circuit home run, device and fixture counts, GFCI/AFCI protection, licensed electrician labor hours, the permit and inspection, and any drywall patching required after old-work wiring.

How do you price electrical work?

Residential electrical is usually priced per device and per circuit: a rate per receptacle, switch or fixture, plus a rate per home run, plus separate packages for the panel, service and specialty circuits such as EV chargers.

What electrical codes apply to residential work?

The National Electrical Code (NFPA 70) governs, adopted with local amendments: Article 210 for branch circuits and receptacle spacing, 210.8/210.12 for GFCI and AFCI, Article 250 for grounding and bonding, and Article 314 for box fill.