Free Concrete Estimate Template

A complete, line-item concrete estimate you can preview below — excavation and haul-off, compacted base, forms, rebar and mesh, ready-mix, placement and finishing, control joints and curing — with a plain-language guide to strength, air entrainment, footing depth and reinforcement.

Estimate #CN-2026-118
Delaney Residence — Driveway Replacement
980 sq ft · 5in slab · 4,000 psi · broom finish
Sample
Line itemQtyAmount
Demo & haul existing driveway980 sf$2,156.00
Excavation & grading1 lot$980.00
Compacted 4" crushed base12 tons$744.00
Forms, stakes & release1 lot$520.00
#4 rebar @ 18" o.c. + chairs1 lot$690.00
Ready-mix 4,000 psi (5in slab)16 cy$2,880.00
Placement & broom finish labor1 lot$2,450.00
Control joints, cure & seal980 sf$490.00
Total$10,910.00

Payment schedule

Deposit (on approval) (30%)$3,273.00
Base & forms complete (30%)$3,273.00
Final — pour, finish & cure (40%)$4,364.00

How to measure and price concrete work

  • Cubic yards = length x width x thickness in feet ÷ 27, plus 5–10% for subgrade variation and spillage.
  • Quote base, forms, reinforcement, mix and finish as separate lines so an upgrade (stamped, colored, thicker slab) is easy to price.
  • Add pumping, Saturday delivery and short-load fees when they apply — dispatch charges them and clients dispute them.

Concrete building-code guide

2021 IRC R402.2 / R403 / R506 · ACI 318 & ACI 332 — concrete, footings and slabs

Concrete inspections happen before the pour, not after. The inspector is checking depth, bearing, reinforcement and the mix you specified on the ticket.

MIX & DURABILITY (IRC Table R402.2)
  • Minimum 2,500 psi for basement slabs and interior work in every weathering zone
  • 3,000 psi minimum for basement walls and foundations; 3,500 psi in severe weathering areas
  • Exterior flatwork exposed to freeze-thaw must be air-entrained 5–7% and at least 3,500 psi
FOOTINGS (IRC R403)
  • Footings must bear on undisturbed soil below the local frost line — depth is set by your jurisdiction
  • Minimum footing thickness 6"; projection each side must not exceed the footing thickness
  • Step footings on slopes so the top and bottom are level, with a maximum slope of 1 unit vertical in 10 horizontal on the bottom
SLABS ON GRADE (IRC R506)
  • Minimum slab thickness 3.5"; base course of 4" clean graded gravel or crushed stone under the slab
  • A 10-mil vapor retarder is required under slabs in habitable spaces (lapped 6in at seams)
  • Reinforcement should be positioned in the upper third of the slab on chairs — mesh laid on the ground does nothing
JOINTS, CURING & FINISH
  • Cut control joints within 6–12 hours, to 1/4 of the slab depth, in panels no more than 2–3x the slab thickness in feet
  • Never add water on site to make it workable — it lowers strength and causes surface crazing
  • Cure for a minimum of 7 days (wet cure or curing compound); protect from freezing for the first 24–48 hours

Code quick referenceConcrete

ItemRequirementCode reference
Footing depth12in below undisturbed ground and below frost lineIRC R403.1.4
Footing widthPer load-bearing table for soil and storiesIRC Table R403.1
Anchor bolts1/2in min, 6 ft OC, within 12in of plate endsIRC R403.1.6
Slab3-1/2in min thickness on compacted baseIRC R506.1
Vapor retarder6-10 mil under slabs in conditioned spaceIRC R506.2.3
Control jointsSpacing 24-36x slab thickness; saw-cut earlyACI 302

Drawings & details

Simplified section and plan views of the details inspectors look at most. Illustrative only — not to scale.

Footing depth (IRC R403)
Grade1 · 36.00"2 · 16.00"3 · 3' 0"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Depth below gradeBelow local frost line(36.00")
  • 2 · Footing widthWidth per load table(16.00")
  • 3 · Height above gradeWall / column(3' 0")
Client presentation summary
  • Depth below grade: 36.00" · Footing width: 16.00"
  • Height above grade: 3' 0"
  • Below local frost line
Minimum 12in below undisturbed ground, and below frost depth for your jurisdiction.
Slab-on-grade build-up
1 · Concrete slab — 4.00"4in typical residential4.00"2 · Reinforcement — 0.50"rebar or WWF, on chairs3 · Vapor retarder — 0.06"10 mil under conditioned space4 · Compacted base — 4.00"4in clean gravel4.00"8 9/16"Section view — top layer first · Total assembly: 8.56"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Concrete slab4in typical residential(4.00")
  • 2 · Reinforcementrebar or WWF, on chairs(0.50")
  • 3 · Vapor retarder10 mil under conditioned space(0.06")
  • 4 · Compacted base4in clean gravel(4.00")
Client presentation summary
  • Concrete slab: 4.00"
  • Reinforcement: 0.50"
  • Vapor retarder: 0.06"
  • Compacted base: 4.00"
  • Total assembly: 8.56" (8 9/16")
Control joints at 24-36x slab thickness in feet; saw-cut within 12 hours.
Inspection-day checklistShow
  • Forms, rebar chairs and vapor retarder inspected before the pour.
  • Ticket kept for mix design, slump and air content.
  • Rebar laps and cover measured (3in against earth).
  • Finishing not started while bleed water is on the surface.
  • Curing method documented — wet cure or cure compound for 7 days.

Code references are based on the 2021 IRC and related model codes. Local amendments, state codes and manufacturer instructions can be stricter — always confirm with your local building department before starting work.

Common concrete estimating mistakes

  • Not verifying frost depth with the local jurisdiction before quoting footings.
  • Underestimating demo and haul-off, which on a driveway is often as expensive as the new pour.
  • Leaving out the sealer and control joints, then getting blamed for random cracking.
PDF & client share

Export a branded, client-ready PDF or send a sign-from-phone link.

Digital signature

Your client reviews and signs the estimate from any device.

Code-aware

IRC R402/R403/R506 guidance for mix strength, air entrainment, frost-depth footings, vapor retarder and control joints.

Concrete estimate FAQ

What should a concrete estimate include?

A concrete estimate should list demo and haul, excavation and grading, compacted base, forms, reinforcement, cubic yards of ready-mix with the psi, placement and finishing labor, control joints, and curing or sealing.

How do you calculate concrete yardage?

Multiply length by width by thickness in feet and divide by 27 to get cubic yards, then add 5–10% for subgrade variation and waste. A 980 sq ft driveway at 5 inches thick is about 16 cubic yards.

What strength concrete does a driveway need?

Most codes require at least 3,500 psi air-entrained concrete for exterior flatwork in freeze-thaw regions, and many contractors specify 4,000 psi for driveways carrying vehicle loads.