Free Bathroom Remodel Estimate Template

A complete, line-item bathroom remodel estimate you can preview below — demo, plumbing and electrical rough-in, backer board and waterproofing, tile, vanity and tops, fixtures and trim — with a plain-language guide to fixture clearances, GFCI protection, exhaust ventilation and shower waterproofing.

Estimate #BR-2026-194
Foster Residence — Hall Bath Remodel
60 sq ft · tub-to-shower conversion · tile floor & walls
Sample
Line itemQtyAmount
Demo, dust containment & disposal1 lot$1,180.00
Plumbing rough-in & valve relocate1 lot$2,450.00
Electrical — GFCI, vanity light, exhaust fan1 lot$1,320.00
Backer board & waterproofing membrane1 lot$980.00
Tile — floor & shower walls (installed)148 sf$3,700.00
Vanity, top & mirror1$1,650.00
Fixtures — toilet, shower trim, glass door1 lot$2,280.00
Paint, trim & final clean1 lot$740.00
Permit & inspections1$310.00
Total$14,610.00

Payment schedule

Deposit (on approval) (30%)$4,383.00
Rough-in inspection passed (30%)$4,383.00
Tile & waterproofing complete (25%)$3,652.50
Final — fixtures set & punch list (15%)$2,191.50

How to measure and price bathroom remodel work

  • Price by scope block (demo, plumbing, electrical, tile, finishes) rather than by room square foot — bathrooms are labor-dense.
  • Tile is the biggest labor variable; quote floor and wall areas separately with the pattern noted.
  • Add an allowance for hidden rot or old galvanized piping in any home over 30 years old.

Bathroom Remodel building-code guide

IRC R307 clearances · P2708 shower size · M1507 ventilation · NEC 210.8 GFCI

Bathrooms come down to four things: does the fixture layout have legal clearance, is the shower big enough and waterproofed, is there real exhaust ventilation, and is everything GFCI protected.

FIXTURE CLEARANCES (IRC R307.1 / P2705)
  • Toilet needs 15" minimum from center to any side wall or fixture, and 21" clear in front
  • Lavatory requires 21" clear in front; a shower door must open outward or be sized for egress
  • Showers require a minimum 30" x 30" interior (900 sq in) with a 22" minimum door opening
WET AREA SUBSTRATE & WATERPROOFING (R702.4 / P2709)
  • No paper-faced gypsum behind tile in a shower; use cement board or a listed backer with a bonded membrane
  • Shower walls finished with a non-absorbent surface to at least 72" above the drain
  • Shower pan sloped 1/4" per foot to the drain and flood-tested before tile
ELECTRICAL (NEC 210.8 / 210.11 / 406.9)
  • All bathroom receptacles must be GFCI protected and served by a dedicated 20-amp circuit
  • At least one receptacle within 36in of the outside edge of each lavatory basin
  • Luminaires and fans in or over a tub/shower must be listed for damp or wet locations, and GFCI protected in the zone
VENTILATION (IRC M1507)
  • 50 CFM intermittent or 20 CFM continuous exhaust, ducted to the outdoors — never into an attic or soffit
  • Duct must be smooth-wall where possible, insulated in unconditioned space, with a backdraft damper
  • A window does not satisfy the exhaust requirement in most adopted codes for a remodel with mechanical work

Code quick referenceBathroom Remodel

ItemRequirementCode reference
Toilet clearance15in center to wall, 21in clear in frontIRC P2705.1
Shower size30in x 30in min interior, 24in clear accessIRC P2708
Exhaust fan50 CFM intermittent or 20 CFM continuous, ducted outsideIRC M1505.4
GFCIAll bathroom receptacles; at least one within 36in of the basinNEC 210.8 / 210.52(D)
Water temperatureShower/tub valves limited to 120°FIRC P2708.4
Wet-area backerCement/fiber board + waterproof membraneIRC R702.4

Drawings & details

Simplified section and plan views of the details inspectors look at most. Illustrative only — not to scale.

Fixture clearances
Toilet1 · 21.00"2 · 15.00"3 · 60.00"4 · 5' 4 12/16"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Front clearance21in min clear in front (30in preferred)(21.00")
  • 2 · Rear clearance15in center to wall(15.00")
  • 3 · Unit / fixture widthToilet(60.00")
  • 4 · Wall to wallTotal room dimension needed(5' 4 12/16")
Client presentation summary
  • Front clearance: 21.00" · Rear clearance: 15.00"
  • Unit / fixture width: 60.00"
  • 21in min clear in front (30in preferred)
Shower: 30in x 30in minimum interior with a 24in clear access.
Wet wall assembly
1 · Tile + grout — 0.06"2 · Waterproof membrane — 72.00"to 72in+ above drain in showers72.00"3 · Cement / fiber backer board — 0.50"no paper-faced gypsum in showers4 · Blocking + framing — 0.50"grab-bar blocking is cheap now6' 1 1/16"Section view — top layer first · Total assembly: 73.06"
Clearances, spacing & part thickness

Adjust the values — the drawing below updates in real time.

Drawing legend
  • 1 · Tile + groutLayer in the assembly, drawn top to bottom(0.06")
  • 2 · Waterproof membraneto 72in+ above drain in showers(72.00")
  • 3 · Cement / fiber backer boardno paper-faced gypsum in showers(0.50")
  • 4 · Blocking + framinggrab-bar blocking is cheap now(0.50")
Client presentation summary
  • Tile + grout: 0.06"
  • Waterproof membrane: 72.00"
  • Cement / fiber backer board: 0.50"
  • Blocking + framing: 0.50"
  • Total assembly: 73.06" (6' 1 1/16")
Exhaust fan ducted to the exterior, 50 CFM intermittent or 20 CFM continuous.
Inspection-day checklistShow
  • Shower pan flood test held 24 hours and photographed.
  • Waterproofing continuous at corners, curb and pipe penetrations.
  • Fan ducted to the exterior — not into the attic.
  • Blocking installed for future grab bars while walls are open.
  • Final: valve temperature, drainage slope, and GFCI test.

Code references are based on the 2021 IRC and related model codes. Local amendments, state codes and manufacturer instructions can be stricter — always confirm with your local building department before starting work.

Common bathroom remodel estimating mistakes

  • Moving the toilet or shower drain without pricing the floor opening and re-piping.
  • Omitting the waterproofing line and the flood test — the two things that prevent a callback.
  • Forgetting the exhaust fan duct run to the exterior, which fails inspection every time.
PDF & client share

Export a branded, client-ready PDF or send a sign-from-phone link.

Digital signature

Your client reviews and signs the estimate from any device.

Code-aware

IRC fixture clearances, shower size and waterproofing, exhaust ventilation rates and NEC GFCI protection.

Bathroom Remodel estimate FAQ

What should a bathroom remodel estimate include?

A bathroom remodel estimate should list demo and containment, plumbing and electrical rough-in, backer board and waterproofing, tile with square footage, vanity and top, fixtures and glass, paint and trim, and permits with inspections.

How much does a bathroom remodel cost?

A full hall-bath remodel with a tile shower typically runs $12,000–$20,000 in most U.S. markets. Moving plumbing, custom glass and high-end tile push the number higher.

What are the code clearances for a toilet?

The IRC requires at least 15 inches from the toilet centerline to any wall or fixture on each side and 21 inches of clear space in front of the bowl.