Demonstration mode
Sample estimate with simulated drawings
Every number, client and drawing on this page is simulated sample data — it is not a real project.
ESTIMATE #00000000
Deck
Carpentry · New Construction · Sep 14, 2026
PREPARED BY
Sample Contracting LLC
(555) 010-0100
office@example.com
PREPARED FOR
Sample Client
Sample Residence
123 Example St, Anytown, USA
Materials
Structural Framing$368.13
2x8x10 Joist PT Pressure treated #2 | 14 pieces | $237.58 |
4x4x8 Post PT Ground contact | 7 pieces | $104.79 |
Joist Hanger 2x8 Simpson LUS28 | 14 pieces | $25.76 |
Decking Surface$212.64
PT Decking 5/4x6x12 Pressure treated | 10 boards | $138.70 |
Deck Screws 3in 5lb Coated exterior | 2 boxes | $73.94 |
Footings$94.92
Concrete Mix 80lb Quikrete 4000psi | 14 bags | $94.92 |
Guardrail (IRC R312 - Required)$464.51
4x4x8 Post PT Guardrail posts, ground contact | 8 pieces | $119.76 |
2x4x8 PT Rail Top + bottom rails | 11 pieces | $65.78 |
2x2x42 Baluster PT Spacing under 4" (code) | 88 pieces | $174.24 |
Railing Bracket Kit Post-to-rim bolts + connectors | 8 kits | $71.76 |
Exterior Screws 2.5" 5lb Coated | 1 box | $32.97 |
Scope illustration (simulated)
Framing layout — simulated
Surface & base — simulated
Simulated drawings for demonstration only — not photos of the job site and not to scale.
Labor
| Build deck (framing + decking + rails) | 192 sqft × $16.00 | $3,072.00 |
| Build guards/railing (>30" code) | 40 lf × $9.00 | $360.00 |
CLIENT TOTAL
$4,950.24
Payment Schedule
- Deposit(40%)$1,980.10
- Mid-project(40%)$1,980.10
- Completion(20%)$990.05